Stud Walls Done


June 27, 2004

All four stud walls are finished with most of the west wall sheathed. Ken is standing in the opening for the equipment door in the east wall. The full-sized man door opening is visible on the southern wall while a window opening is in the east wall. Normally, there would not have been so many diagonal braces on the structure, but we had heard just before this that a wind storm was possible for later that evening. So we rushed outside after dinner and screwed several braces on to stabilize the structure.